Substation Brixton

Commercial client

Rowland Group were instructed in October 2021 to design and install all HVAC systems on a fast-track indoor climbing centre project.
Works included the following:

  • Toshiba VRF installation
  • Fire rated kitchen extract system
  • Dedicated ventilation system to all areas
  • Herschel infrared hot yoga room heaters
  • W/C extraction system
  • RAL colour matched louvres
  • Control Systems to suit

total Value for project = £180,000